Commercial roof replacement
Condition-led replacement planning covering the existing roof, design, removal, new system, access, staging and handover.
Review the serviceCommercial roofing services Australia
SGR Roofing National provides six connected commercial services. An assessment may show that a different service or further investigation is more appropriate than the original request.
Service cluster
Condition-led replacement planning covering the existing roof, design, removal, new system, access, staging and handover.
Review the serviceTargeted investigation and repair scopes for sheets, membranes, flashings, fasteners, penetrations and drainage defects.
Review the servicePlanned inspections and defined maintenance tasks based on condition, exposure, roof-system documents and facility needs.
Review the serviceWater-ingress investigation that records evidence, method limits, inaccessible areas and the recommended next action.
Review the serviceTranslucent roof-sheet assessment and replacement planning around profile, supports, adjoining roofing, access and operations.
Review the serviceMetal wall-cladding and facade work scoped with the substrate, structure, moisture, fire, openings and interfaces in mind.
Review the serviceService selection
Use leak investigation when the water path or failure mechanism is uncertain.
Use rectification when defined defects can be addressed within a compatible targeted scope.
Use replacement planning when failure is widespread, the system is unsuitable or the capital objective requires a new roof.
Use maintenance for planned condition-led care and defined tasks, with larger defects separated for approval.
Use translucent-sheet or cladding assessment where those systems, supports and interfaces are the project focus.
Prepare the enquiry
Site address, building use, roof or wall type, approximate area, plans and product information if known.
Dated photographs, leak or defect locations, previous reports, repairs, maintenance and warranty records.
Working height, access, plant, public areas, occupied spaces, hours, shutdown constraints and protected assets.
The decision required, procurement or approval pathway, target timing and the deliverable needed from the assessment.
Project-specific next step
Send the available site information and photographs. The first step is to define what evidence or assessment is needed.